Road repairs

| November 25, 2010 | 0 Comments
Lyman Road will undergo total reconstruction due to road failure, caused by an increase in traffic volume and an increase in road stress from contractor vehicle loads.

Lyman Road will undergo total reconstruction due to road failure, caused by an increase in traffic volume and an increase in road stress from contractor vehicle loads.

Directorate of Public Works, News Release

SCHOFIELD BARRACKS — Lyman Road will undergo total reconstruction due to road failure, caused by an increase in traffic volume and an increase in road stress from contractor vehicle loads. All work will be done in the evenings. Lyman Road will be drivable from 5 a.m.-6 p.m., daily.

During nightly closures, Foote Gate will serve as the visitor control center. In the evenings, access to Duck Road will be limited. Motorists are urged to take appropriate steps to limit traffic during these periods.

The repair work for Lyman Road will begin Dec. 20, and continue through the entire month of February 2011. Inclement weather may cause some delays.

Call 656-1750 for more details.

Road closures and construction schedules can always be found online at the garrison’s Traffic Alerts page.

Tags: ,

Category: News

Leave a Reply

Your email address will not be published. Required fields are marked *