Traffic Report26 / Saturday

USMC — The Marine Corps will be performing artillery and mortar training on Schofield’s range until Sept. 30, with Army demolition training Sept. 28-29.
For concerns related to the noise or training, call the U.S. Army Garrison-Hawaii noise concern line at 656-3487.

 

28 / Monday

Bougainville Loop —There will be a partial road closure at Aliamanu Military Reservation along Bougainville Loop and at the intersection of Plumeria Loop and Bougainville. Lanes adjacent to existing utility poles along Bougainville Loop will be restricted to one lane only until Oct. 2.

Lanes along Bougainville will be restricted to one lane only through Oct. 9 for utility pole replacement.

The intersection of Plumeria Bougainville will have alternating lane closures, Oct. 9-23, for underground utility installation.

The intersection of Plumeria and Bougainville will have alternating lane closures through Oct. 16 for underground utility installation.

 

30 / Wednesday

Kolekole Klosure — There will be a lane closure on Schofield’s Kolekole Avenue outbound between Flagler Road and Devol Street for utility installation and site work related to the Quad B barracks renovation. The right lane on Kolekole outbound will be closed in front of Bldgs. 2623, 2624 and 2625, daily, 8 a.m.-3 p.m.

Traffic entering and exiting Burger King, Popeye’s, the gas station and mini-mart will not be affected by this closure. Construction is scheduled to end Oct. 23. There will be no work on weekends or holidays.

 

Cadet Sheridan — There will be a complete road closure on Cadet Sheridan Road for utility installation, weekdays, 8:30 a.m.-3:30 p.m., from the north side of Elou Street to the south side of Trimble Road. A portion of the Trimble right turn lane onto southbound Cadet Sheridan will also be closed. The work will be performed until Oct. 2.

Only one road closure will be done at a time in the Trimble and Cadet Sheridan intersection. Trimble will not be closed while Cadet Sheridan is closed and vice versa.

 

Airdrome Road — There will be a partial lane closure to allow for utility installation at the intersection of Wheeler’s Sterling and Airdrome roads.

Airdrome Road will be converted from a two-way road to a one-lane contra-flow around the construction area, consisting of two phases. The first phase, beginning today, will be performed to Oct. 21, tentatively. Phase 2 will be Oct. 21-31.

The work hours for both phases will be weekdays, 8 a.m.-5 p.m. (work on weekends only if necessary).

 Ongoing

 Signal Drain — The traffic flow at Signal Street that began yesterday continues through Oct. 8 for storm drain line replacement.

During the above period, Signal Street will be closed 24 hours a day in both directions. The closure will begin near the southeast corner of Bldg. 1507 and end approximately 100 feet thereafter.

Traffic will be detoured around the closure, through the adjacent parking lot.

 

Updated Bennet Drive — There will be intermittent lane closures at Fort Shafter’s Bennet Drive in the vicinity of Bldgs. 341, 405 and 441 for the installation of a new water main line. The work occupies one lane, including the parking stalls perpendicular to the lane, weekdays, 7:45 a.m.-5 p.m., until Oct. 30.

Intermittent traffic modification is required to allow for the chlorination of the new water main line, followed by the tie-in of the new water main line to the existing line at the intersection of Bennet Drive and Pierce Street.

The preparatory work prior to the chlorination and tie-in begins after the entire length of the water main line for Phase 2 is installed.

Phase 2 has encountered delays attributed to various differing site conditions. The preparatory work prior to the chlorination and tie-in involves excavation, installation of pipe, concrete encasement of pipe, installation and welding thrust blocks, and backfilling at the point of connection. Final tie-in and asphalt paving is anticipated later this month.

 

Lauhala Road — A road closure along Lauhala Road, in the housing area, for earth and roadwork, is expected to conclude Sept. 28. Detours will be performed in phases.

 

Long Construction — A partial, modified traffic flow and road closure near Schofield’s Nehelani for utility installation continues. The area near the loading docks and the parking lot between Bldgs. 2060, 2070 and 2071 are restricted though Dec. 28.

The work will be performed in phases. Parking is limited during closure.