Traffic Report: Nov. 20, 2015

| November 27, 2015 | 0 Comments

Traffic Report

Today

Hark! — Noise from demolitions and artillery may be heard by surrounding communities. The training continues into December, ending on Dec. 7.

Weather can increase noise and vibrations. To report concerns related to noise or training, call 656-3487 or email usaghi.comrel@gmail.com.

 

Crater Rim Loop — A partial road closure at Aliamanu Military Reservation along Crater Rim Loop for new utility pole and underground utility installation began Wednesday. The westbound lane will be closed for underground utility work 7 a.m.-3:30 p.m., excluding holidays, until Dec. 31.

 

Hawaii-State-SealHawaii Department of Transportation Oahu lane closures for the weekend of Nov. 27-29

— H-1 FREEWAY —

1) WAIPAHU (WEEKEND/NIGHT WORK)
Closure of the Waipahu Off-Ramp (Exit 8B) from the H-1 Freeway in the westbound direction on Sunday night, Nov. 29, through Friday morning, Dec. 4, from 9 p.m. to 4 a.m., nightly, for the rail project.

For more information, please visit the project website for The Rail at http://www.honolulutransit.org/.

— FARRINGTON HIGHWAY —

1) PEARL CITY (WEEKEND/NIGHT WORK)
Two lanes closed on Farrington Highway in the westbound direction between Waiawa Road and the Kamehameha Highway Overpass for the rail project.

·        Sunday night, Nov. 29, through Monday morning, Nov. 30, from 8 p.m. to 4 a.m.
·        Monday night, Nov. 30, through Friday morning, Dec. 4, from 9 p.m. to 5 a.m., nightly.

For more information, please visit the project website for The Rail at http://www.honolulutransit.org/.

2) WAIPAHU (WEEKEND WORK)
Honolulu Rail Transit will be working on Farrington Highway this week at various locations. Please visit The Rail’s project website for more details at http://www.honolulutransit.org/.

— KAMEHAMEHA HIGHWAY —

1) MILILANI (WEEKEND/NIGHT WORK)
All lanes closed on Kamehameha Highway in both directions between Ka Uka Boulevard and Lanikuhana Avenue on Sunday night, Nov. 29, through Friday morning, Dec. 4, from 8:30 p.m. to 4:30 a.m., nightly, for road striping, shoulder improvements, and guardrail work.

General traffic will be re-routed for access to Kamehameha Highway via Waipio Uka Street, Ka Uka Boulevard, the H-2 freeway, Lanikuhana Avenue, Meheula Parkway, and Kuahelani Avenue. Local traffic access for Kipapa Gulch residents has been coordinated to be escorted through the project site as needed. Advisory message boards have been placed near Ka Uka Boulevard and Lanikuhana Avenue with the work schedule.

2) PEARL CITY TO AIEA (WEEKEND/NIGHT WORK)
Honolulu Rail Transit will be working on Kamehameha Highway this week at various locations.

·        24/7 lane closures in both directions between Waiawa Road and Kaonohi Street.
·        24/7 lane closures in both directions between Pali Momi Street and Honomanu Street.
·        Lane closure in the westbound direction between Lipoa Place and Pali Momi Street.
·        Lane closures in the eastbound direction between Honomanu Street and Salt Lake Boulevard, Monday through Friday.

 

28 / Saturday

Phase III Flow — Traffic will be restricted access on Schofield’s Trimble Road until Jan.15, 2016, for the third phase of a project for utility installation and curb/sidewalk upgrade. Traffic control will coordinate traffic.

 

30 / Monday

Carpenter Street — There will be a road closure at Schofield’s Carpenter Street, weekdays (except Wednesday), 8:45 a.m.-1:45 p.m., until Dec. 7.

 

Full Closure — A full road closure on Schofield’s Waianae Avenue (South Corridor) between Generals Loop and Jecelin Street will take place, weekdays, 8 a.m.-3:30 p.m., until Christmas. During this closure, Waianae Avenue (North) between Generals Loop and Jecelin Street will be designated for two-way traffic.

During nonworking hours, weekends and holidays, a right lane closure will take effect on Waianae Ave (South Corridor) between Generals Loop and Charlton Street, Monday through Thursday, 3:30 p.m.-8 a.m., and weekends, beginning Friday evenings, at 3:30 p.m. and ending Monday morning at 8 a.m.

Waianae Avenue traffic patterns will not be altered during this lane closure. Traffic control will alternate between the full road closure and right lane closure until Dec. 25.

 

December

 

1 / Tuesday

Rate Increase — For the first time in more than four years, HDOT Airports Division is increasing public parking rates at six of its airports. The new rates will take today. The daily maximum rate at five Hawaii airports will increase by $3.

Call 861-1260 or visit http://hawaii.gov/hnl/airport-parking/parking-rates.

800px-Honolulu_International_Airport_(6932471711)

 

Puakika — The westbound lane of AMR’s Puakika Street will be closed for utility pole replacement starting from today through Dec. 11.

 

Ongoing

 

Wilson Road — There will be intermittent road closures, 7 a.m. to 5:30 p.m., at Fort Shafter’s Wilson Road, near Bldg. 420, the Post Office and the intersection at Montgomery Drive, until Dec. 20.

Traffic on Warner Road headed towards the PX will be detoured onto Pierce Street between Bldgs. 435 and 438, and from the PX headed toward Warner Road.

Traffic will be detoured onto Montgomery Drive. Traffic on Montgomery Drive headed towards the PX parking lot will not be affected.

 

Long Construction — A partial, modified traffic flow and road closure near Schofield’s Nehelani for utility installation continues. The area near the loading docks and the parking lot between Bldgs. 2060, 2070 and 2071 are restricted though Dec. 28.

The work will be performed in phases. Parking is limited during closure.

 

Leilehua Closure — Schofield’s Leilehua Avenue will be closed in phases in order to reconstruct the road.

  • Phase 2 between Kline/Gordon Lane and Stoneman Field Road will be Nov. 30 to Dec. 4. There will be no access to the parking of Bldg. 645, Family and Child Care and the Garrison Sports Office.
  • Phase 3 between McCornack and the Stoneman Field Road will be Dec. 7-11.
  • Phase 1 through 3 closures will be 24 hours a day, seven days a week. The lanes between Leilehua and Waianae Avenue that fall within the closed portions of Leilehua will be made two-way for residents only. On these lanes, there will be no parking in the Leilehua bound side of the road and no parking within 100 feet from Leilehua Avenue. The 100 feet no parking area will be used for cars to turn around.
  • Top lift paving and striping will be performed 8 a.m.-4:30 p.m., Dec. 14-17.

The contractor will have appropriate safety signs and barriers when the parking lot closes.

 

 

Tags: , , ,

Category: Calendar, News, Traffic Report

Leave a Reply

Your email address will not be published. Required fields are marked *