Traffic Report: May 6, 2016

| May 6, 2016 | 0 Comments

Traffic Report

 11 / Wednesday

AMR Power — Aliamanu Military Reservation will have a power outage affecting the shoppette, gas station, Domino’s and Burger King, 5-6 a.m., to support work to limit the number of outages during cutovers associated replacing overhead electrical lines.

 

13 / Friday

Kubo Completion — Intermittent weekday road closures, from Fort Shafter’s Bldg. T-126 to the intersection of Kubo and Funston Road at Bldg. 12, are scheduled to conclude today.

 

14 / Saturday

Power Outage IconPower Outages — The following areas on Schofield Barracks will see a power outage, 7 a.m.-3:30 p.m.: affecting Akolea Point Housing, the motor pool and areas between McMahon and Menoher on Sutton, Capron and Reily Streets.

At the same time, Wheeler and the WiliWili Housing Area will also experience an outage.

 

16 / Monday

Phase One — Overhead electrical power lines on Schofield Barracks will be replaced, and as a result of construction, various roads will be reduced to one lane of traffic at each power pole location being worked on for that day. Some roads will be closed. Sutton Avenue, Tidball Road, McCornack Road, McNair Gate and Leilehua Avenue will be affected.

Phase Two, McNair Gate and McCornack Road, begins May 30.

 

Warhawk Street — There will be a full road closure at Wheeler Army Airfield’s Warhawk Street, between Santos Dumont and Wright Avenue, from today until May 23, to repave the road. Robins Road and Nakamine Street will be the alternate routes. The parking lot for Bldg. 844 will only be accessible from Nakamine Street. There will be intermittent lane closures on the westbound lane of Santos Dumont and the eastbound lane of Wright (near Warhawk), 9 a.m.-3 p.m., until May 23.

 

Wisser Road — There will be intermittent road and parking lot closures at Shafter’s Wisser Road (near Richardson Theater), weekdays, 8:30 a.m.-5:30 p.m., until Sept. 2. for the installation of a new water main line. Wisser will be closed between Funston Road and Bonney Loop for until June 24. Intermittent closures will follow from June 27 to Sept. 2.

WISSER

The intersections of Strong and Pierce streets will be restricted to local traffic only. Richardson Theater and the adjacent parking lots will remain accessible by means of Casey Street. Westbound traffic on Wisser Road heading towards Funston Road will be detoured through Bonney Loop. Eastbound traffic from Funston Road, heading towards the Exchange and Patch Gate, will be detoured through the west end of Bonney.

 

19 / Thursday

Lane Closure — There will be a lane closure on Schofield’s Sargent Street next to Bldg. 690, for water main excavation. Sargent will be restricted to one-lane access from Wednesday until June 23. During all construction the contractor will have all appropriate signs and barriers for closing each side of the roadway.

  • Phase I — May 19-June 2
  • Phase II — June 2-9
  • Phase III — June 9-21
  • Phase IV — June 21-23

 

23 / Monday

Road Range — There will be a partial road closure at the intersection of Kelly Road and South Range Road, near Bldg. 1410, for underground support structure installation. The area near the building 1410 parking lot and Kelly Road, and South Range Road will be restricted to one lane access, 6:30 a.m.-4:30 p.m., until June •Watch this space for additional construction phases.

June

 6 / Monday

Phase 8 Closures — There will be one-lane roads and road closures affecting drivers traveling on Schofield’s McMahon Road, Akolea Drive, Beaver Road, Hawaii Street, Molokini Street and Oahu Street for replacing overhead power lines. Roads will be reduced to one lane of traffic at each utility pole location being worked on for that day and various roads will be closed. Road closures will last approximately 5-10 minutes.

The next phases of this project begin July 5 and July 18.

 

 

18 / Saturday

map2 mathews

Power Outage — The following buildings along Mathews Ave., Schofield Barracks, will be without power, 7 a.m.-3:30 p.m., to install an electrical transformer: 2026, 2027, 2029, 2031, 2032, 2033, 2034, 2098, 3030, 2037, 2038 and 2040.

 

Ongoing

 

Revised Lyman/Flagler — There are traffic modifications, weekdays, 7 a.m.-4 p.m., at Schofield’s intersection of Lyman and Flagler to widen Lyman Road, add a dedicated left turn lane, and add traffic and pedestrian signals to the intersection, until Aug. 12.

Construction will be phased, so road widening will be performed first, providing an additional lane. The majority of the project will allow traffic to flow in both directions of Lyman and Flagler. Turns will be limited at the intersection to provide two lanes of traffic.

 

Airdrome Road — One-lane road closures along Wheeler’s Airdrome Road from the sewage treatment plant to the flight simulator continue weekdays, 8 a.m.-3:30 p.m., until June 30.

 

Menoher — There will be a road closure on Schofield’s Menoher Road, between Capron and Sutton avenues, for utility installation. Traffic will be detoured around the construction area through Reilly Avenue, Williston Avenue, Cadet Sheridan Road and Sutton. The work will be performed 8:30 a.m.-5:30 p.m. until the end of May.

 