Traffic Report: August 19, 2016

| August 19, 2016 | 0 Comments

Traffic Report20 / Saturday

Noise Advisory — Artillery training continues at Schofield Barracks and noise may be heard by surrounding communities.

  • Aug. 20-26: Army Lightning Academy training continues.
  • Aug. 29: Army mortar training.
  • Aug. 29-Sept. 2: Army artillery training.
  • Aug. 30-Sept. 1: Army demolitions training.

 

22 / Monday

Park Place — Fort Shafter Flats will have parking lot closures off Signal Road for drain line work. Different portions of the lot will be closed off during the various phases of the work. This first phase continues until Aug. 29, and the project should end Sept. 12.

 

Signal, Phase 2 — Parking lot closures off Fort Shafter’s Signal Road continue as the second phase begins. Different portions of the lot will be closed off during the various phases of the work. Phase 2 will run until Aug. 29 and consists of closing the northwest entrance to the parking lot as well as subsequent stalls.

 

29 / Monday

Repaving — There will be partial road closures on one lane until Sept. 22, weekdays, 7:30 a.m.-4 p.m., at Schofield Barracks’ Lyman Road (between Hewitt and Carpenter) in order to repave the road. Partial closures will allow two-way traffic flow on the opposite lane. Alternate routes will be through Waianae Uka Avenue, Hewitt Street, and Kolekole Avenue.

 

Signal, Phase 3 — The third phase of parking lot closures off Fort Shafter’s Signal Road continues as Phase 3 begins. The northeast stalls will be blocked off through Sept. 5. The project should conclude by Sept. 12.

 

Ongoing

 

Airdrome Closures — One-lane road closures from the sewage treatment plant to the flight simulator continue until the end of August on Wheeler’s Airdrome Road.

Comprehensive Soldier and Family Fitness (CSF2)

C2F-MCF — Continuing work on the Command and Control Facility project is installing communication cables from Bldgs. 220, 118 and 103 to Bldg. A0600. Periodic roads and parking lot area closures affected by this work are Chamberlain Road, Austin Road, Wisser Road, Pierce Street, Parks Road, Rice Street, Morton Drive, Carter Drive, Palm Circle Drive, Hyland Lane, Fort Shafter Street, roads near and around Bldgs. 223 and 252, “I” Place, Bonney Loop, Artillery Hill Road and Walker Drive.

Expect slight delays while traveling in these areas and allow extra time. The installation work will require blocking off parking stalls around Bldgs. 117, 118, 220 and 103 (mostly weekends). Work will continue, weekdays, 8 a.m.-5 p.m., until the end of August.

 

Back Door — Customers requiring services at the Soldier Support Center, Bldg. 750, Schofield Barracks, must enter from the back of the building through the lanai walkway due to construction and landscaping projects. Access will be constricted until the end of November. All human resources, finance, transportation and replacement detachment services remain available during normal duty hours.

 

Kolekole Flow — There is a partial road closure of Kolekole Avenue fronting the Schofield Inn for the construction of drainage improvements to the area. The westbound traffic of Kolekole will be detoured onto Trimble Road northbound until Cadet Sheridan Road, where a left turn will be taken onto Cadet Sheridan southbound until it is returned to Kolekole. This detour will be in effect until Aug. 31, weekdays, 7 a.m.- 3:30 p.m.

 

Kolekole Detour — There will be a partial road closure of Kolekole Avenue fronting the Schofield Inn for construction. The westbound traffic will be detoured onto Trimble Road northbound until the intersection with Cadet Sheridan Road – where a left turn will be taken onto Cadet Sheridan southbound – is returned to Kolekole.WHEELER ARMY AIRFIELD — Wright Avenue, here, will be closed between Frutchey Road and Sperry Loop for road construction until July 22. It will also be closed on the eastbound lanes between Elleman and Burns roads until Aug. 12. To alleviate traffic, Santos Dumont Avenue has been reopened. If crossing through WAAF, it is best to stay on Santos Dumont Avenue and exit through Kawamura Gate, as the barracks construction project also may have the other end of Wright Avenue closed during this time. For additional traffic updates, visit www.garrison.hawaii.army.mil; click on "Post Information," then "Traffic Updates. (Vickey Mouzé | U.S. Army Garrison-Hawaii Public Affairs)

This detour will continue, weekdays, 8:30 a.m.-5 p.m., until Sept. 16. A message board will be placed on Kolekole prior to the roadwork and notifying motorists of the upcoming detour.

 

Revised Wisser — There are road closures at Wisser Road and Bonney Loop in the vicinity of Bldg. 520 for the installation of a new water main line, 8:30 a.m.-5:30 p.m., until Sept. 30.

  • Wisser and the intersection at Bonney will be closed, weekdays, between Pierce Street and 7th Street from today until Aug. 26.
  • Intermittent closures will follow from Aug. 29 to Sept. 30. The parking lot and Bonney Loop adjacent to Bldg. 520 will be restricted to local traffic only.

While the intersection of Bonney and Wisser is closed for construction, a flagger will be at the southern intersection of Bonney Loop and Pierce Street to facilitate access to Bldg. 520. A second flagger will be stationed farther up Bonney Loop to facilitate the movement of cars and pedestrians adjacent to Bldg. 520.

The parallel parking stalls along the southern perimeter of the parking lot will be restricted to allow for two-way traffic movement.

  • When no work is being done at the intersection of Wisser and Bonney, it will be reopened, and the road closure will be reduced.

 

 

 

 

 

 

Tags: , , , ,

Category: Calendar, News, Traffic Report

Leave a Reply

Your email address will not be published. Required fields are marked *